Survey teams mobilised on projects in Norwich, Barrowden in Rutland, and Bourton on the Water in Gloucestershire.
In Norwich, a fifty acre brown field site was levelled with two GPS RTK rovers in order to calculate a flood risk assessment for the site.
Storm Geomatics carried out a feasibility study on a mill pond restoration project at Barrowden. The original channel to the Mill pond has been filled in, and has left the pond stagnant. Surveyors worked out a route to take water off the nearby River Welland, and working with hydraulic engineers, provided an outline scheme and costing to bring fresh water back to the pond.