Tackling Spring Vegetation for Flood Risk Data

Scroll

The Background

Date
April 2024
Client
Environment Agency

Storm surveyors put to use their safety training and experience whilst undertaking a complex project of cross section surveys on four separate reaches within the Duffield area of Derbyshire. Each one presenting its own challenge. Like so many of Storm’s projects the data will be used for modelling flood risk.

Lead Surveyor James Mayer effectively planned out each day, arranging the access that was needed for each site in good time, ensuring efficient workflows.

Process

The Challenge

Some of the structures proved quite difficult to survey due to either being blocked by dense vegetation; often an issue at this time of year; or because they had collapsed. With dilapidated structures, such as the one shown in figure 1, it is especially important to pick up as much information on site as possible to ensure smooth data processing.

By using a laser and careful positioning of the survey pole our experienced surveyors were able to accurately convey the structure opening (figure 2). 

Process

More Challenges

Another challenge faced by the surveyors was collecting data on the Chesterfield Canal as this time of year, the waterway can get congested with traffic.

Therefore, in order to carry out work safely, signs were put up at specific intervals up and downstream to warn boats that work was being carried out. This was arranged with the Canal and Rivers Trust well in advance of site deployment and is a prime example of how efficient planning from our survey managers help a project run smoothly to meet deadlines and keep to budget.  

Process

The Results

The team supplied deliverables as cross and long section data of all the reaches, flood defence string data and detailed photographs, all formatted in the correct file formats requested by the client. A long section drawing showing a series of weirs in 2D can be seen below. Along with a cross section drawing of a culvert flow through an access bridge.

“This project showcases Storm’s ability to coordinate multi-reach jobs in an efficient manner. Good communication between the surveyors and the client is vital and the success of this project is an indication of that”
- James Mayers
Surveyor

Recent News

Storm brings in the Big Guns…

A multifaceted survey required experienced leadership during May, Senior Surveyor Laurence Washbrook lead this project to co-ordinate a topographic,...

Find Out More

Do you have a project we can help with?

Call 01608 664910 or